16th NOVEMBER 2026

Process Cooling

Winter Cooling System Checklist: Essential Checks to Prevent Costly Downtime  

Winter Cooling System Checklist: Essential Checks to Prevent Costly Downtime  

As temperatures drop across the UK, ensuring your industrial cooling system is prepared for winter is essential to maintaining production efficiency and preventing costly breakdowns. 

For plastics manufacturers, freezing conditions can cause significant damage to pipes, heat exchangers, valves and other exposed components. However, many of these issues can be prevented through regular inspections and preventative maintenance. 

As a UK supplier of Frigel cooling solutions to the plastics industry, Summit Systems highlights five essential checks to help protect your cooling equipment this winter. 

1. Check Coolant and Antifreeze Protection 

Ensure glycol concentrations are suitable for the expected operating temperatures and check the overall condition of the coolant. Inadequate antifreeze protection can result in frozen circuits and damaged components. 

2. Inspect Exposed Pipework and Insulation 

Check external pipework, valves and fittings for damaged or missing insulation. Pay particular attention to areas with limited water circulation, where freezing is more likely to occur. 

3. Check System Drainage 

For systems designed to be drained, ensure water can be completely evacuated from vulnerable circuits. Water trapped within pipes or heat exchangers can freeze, expand and cause significant damage. 

4. Test Heating and Circulation Protection 

Verify that electric frost protection heaters and recirculation pumps are operating correctly. These components play an important role in maintaining safe operating conditions during freezing temperatures. 

5. Review Controls, Sensors and Alarms 

Check temperature sensors, alarm settings and automatic antifreeze protection functions. Ensure control systems are correctly configured and review power backup arrangements where applicable. 

The Cost of Freezing Goes Beyond Equipment Repairs 

A frozen cooling circuit can lead to much more than a damaged pipe or component. For plastics manufacturers, a loss of cooling capacity can result in production downtime, inconsistent process temperatures, increased scrap rates and delayed customer orders. Identifying potential vulnerabilities before temperatures fall can help prevent unexpected breakdowns and keep production running efficiently. 

Keep Your Cooling Systems Running with Summit Systems 

At Summit Systems, we understand the importance of reliable cooling in plastics manufacturing. Working closely with Frigel, we supply and support industrial cooling solutions designed to deliver efficient, reliable temperature control. Our experienced service engineers also provide Preventative Maintenance Visits, helping customers identify potential issues before they result in costly breakdowns or production interruptions. 

Don’t wait for freezing temperatures to cause an unexpected breakdown – Contact Summit Systems to discuss your cooling system maintenance requirements and ensure your equipment is prepared for winter. 

Speak to the experts today

Call us

+44(0)1827 265 800

General Enquiries

hello@summitsystems.co.uk
Contact Us
Summit Systems needs the contact information you provide to us to contact you about our products and services. You may unsubscribe from these communications at any time. For information on how to unsubscribe, as well as our privacy practices and commitment to protecting your privacy, please review our Privacy Policy.